At Durga Engineering Works, we are proud to be executing multiple high-value hydro power projects across India in 2025. These projects showcase our technical expertise, leadership in the hydroelectric sector, and our growing role in building India’s renewable energy future.


1. Manidam SHEP – 3 × 3 MW Horizontal Full Kaplan Turbines

A major servicing project that highlights our continued excellence in electromechanical works for mini hydro power plants.

  • Complete dismantling
  • Servicing of all components
  • Re-assembling
  • Re-erection and re-alignment
  • Commissioning and testing

2. Karnataka – Horizontal Bulb Turbine (3 × 5 MW)

An end-to-end overhaul project involving three large units, covering turbines, gearboxes, and generators.

  • Turbines Overhauling: Complete dismantling, servicing, re-assembly, re-erection, testing & commissioning
  • Gearbox Overhauling (3 Units): Dismantling, cleaning, inspection, and re-erection
  • Generator Overhauling (3 Units): Disassembly, water washing, drying, insulation resistance (IR) testing, re-alignment & re-erection

This project demonstrates our ability to handle large-scale hydro machinery overhauls with precision and reliability.


Expansion into New Domains

Starting in 2025, Durga Engineering Works has expanded into erection and commissioning of new hydro power plants, marking a significant milestone in our growth journey. With a skilled workforce, strong focus on safety, and consistent quality, we are now recognized as one of the fastest-growing hydro service companies in India.


Current New Erection Projects

We are actively executing new hydro plant erection and commissioning projects in Himachal Pradesh and Karnataka, involving both Pelton and Kaplan turbines.

Himachal Pradesh – 1000 kW Horizontal Pelton Turbine

  • Earth mat laying
  • Erection, assembly and alignment of spiral casing, runner, and draft tube
  • Installation of turbine, generator, OPU, CWS, and all auxiliary components
  • Erection of all electrical equipment including ODY
  • EOT crane erection

Karnataka – 2 × 2500 kW Vertical Full Kaplan Machines

  • Earth mat laying
  • Erection, assembly and alignment of spiral casing, runner, and draft tube
  • Installation of turbine, generator, OPU, CWS, and all auxiliary components
  • Erection of all electrical equipment including ODY
  • EOT crane erection

These new projects highlight our full-scale capabilities in installation, alignment, commissioning, and testing of hydroelectric equipment across India.

S.No. Project Name (Location) Capacity Type of Turbine Services Provided Status
1 Tembu Hydro Power Plant (Karad, Maharashtra) 3 × 1.5 MW Vertical Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
2 Yogindera Powers Ltd (Kangra, Himachal Pradesh) 2 × 2.5 MW Horizontal Francis Dismantling, Servicing & Erection (Full Servicing) Completed
3 Kalam Power Plant (Nelakondapalli, Khammam, Telangana) 3 × 700 kW Vertical Kaplan Maintenance and Servicing Work Completed
4 Sarovara Energy Pvt. Ltd (Agrahara, Karnataka) 2 × 700 kW Vertical Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
5 NATL Power Limited (Yathavakilla, Telangana) 3 × 1.5 MW Horizontal Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
6 Sakleshpura Hydro Power Plant (Karnataka) 2 × 1.5 MW Horizontal Francis Dismantling, Servicing & Erection (Full Servicing) Completed
7 Green Hydro Power (Yadgir, Karnataka) 3 × 4.5 MW Horizontal Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
8 Kare Power (Lingsugur, Karnataka) 2 × 12 MW Vertical Kaplan Runner Maintenance Completed
9 Gayatri Power (Nalgonda, Telangana) 1 × 1.5 MW & 1 × 700 kW Vertical Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
10 Bonal Hydro Electric Plant (Lingsugur, Karnataka) 1 × 1 MW Vertical Kaplan Servicing and Maintenance Work Completed
11 Shamil Hydro Project (Sidhapur, Karnataka) 2 × 5.5 MW Horizontal Kaplan All machine body dismantling and servicing Completed
12 NLBC Hydel Project (Murudeshwara HEP) 12 MW Vertical Kaplan Repair, Testing & Commissioning Completed
13 Kaveri Hydel Power Pvt. Ltd. 1.5 MW Vertical Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
14 Gokak Energy Hydro Power Projects (Gokak Falls, Belgaum) 2 × 1.5 MW Horizontal Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
15 Mahatma Gandhi Hydro Power Plant (Jog Falls, Karnataka) 8 × 8 MW Horizontal Pelton Bearing pad Works Completed
16 Bhoruka Power Corporation Limited 1.5 MW & 12 MW Vertical Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
17 Shahapur Mini Hydel Stations 1.5 MW Horizontal Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
18 Chamoli Hydro Power Pvt. Ltd. - - Project Main Gate Servicing Work Completed
19 Kare Power Resources Pvt. Ltd. 2 × 12 MW Vertical Kaplan Runner Chamber Works Completed
20 Bonal Hydro Electric Company Pvt. Ltd. 1 × 1 MW Vertical Kaplan Servicing and Maintenance Work Completed
21 Sugnaneshwara Hydel Power Pvt. Ltd. 3 × 4.5 MW Horizontal Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
22 Gokak Energy Hydro Power Projects (Gokak Falls, Belgaum) 2 × 1.5 MW Horizontal Kaplan Dismantling, Servicing & Erection (Full Servicing) Completed
23 Nilwande Hydro Electric Project 2 × 3.5 MW Vertical Kaplan Machine alignment & commissioning work Completed
24 Hydel power plant (AMR) Rithwik project 10 × 5 MW - Testing & commissioning of guide vane rotating assembly operating ring complete set Completed
25 Bhoruka Power Corporation (SRD Katte Site) 2 × 750 kW Horizontal Dismantling, Servicing & Erection (Full Runner Hub Servicing) Completed
26 Mani Dam Power House, KPCL (BFL Site) – ONGOING 2 × 4.5 MW Vertical Kaplan Dismantling, Refurbishment, Re-erection & Commissioning of Electro-Mechanical Equipment Ongoing
27 Greenergy Wind Corporation Pvt. Ltd. 4.5 MW Horizontal Kaplan Flexible coupling replacement, re-erection, re-alignment and commissioning Completed
28 Texron Power Plant Systems – Urumi-1 Stage (Kozhikode) 1.25 MW Horizontal Francis Generator dismantling, re-erection & re-alignment Completed
29 B Fouress Pvt. Ltd. (BFL Workshop) - - Fabrication and assembling of cooling water system sets Completed
30 Gayatri Power (Mini Hydel) 1 × 1.5 MW & 1 × 700 kW Vertical Kaplan Dismantling, Refurbishment, Re-erection & Commissioning of Gearbox and Generator Completed
31 Khare & Tarkunde Green Energy Pvt. Ltd. 2 × 2 MW Vertical Kaplan Deputation of employees for turbine erection work; Penstock fabrication work Completed
32 IQBAL Hydro Electric Project (BFL Site) – ONGOING 3 × 1.25 MW Horizontal Full Kaplan Dismantling, Refurbishment, Modification, Re-erection & Commissioning Ongoing
33 Khandaleru Power Company Limited 3.5 MW Vertical Kaplan Generator dismantling, Re-Alignment and Re-erection work Completed
34 Gokak Power & Energy Limited 2 × 1.5 MW Horizontal Kaplan Penstock pipe dismantling and new pipe erection work Completed
35 TSGENCO - Palair MHS (BFL Site) 1.5 MW Horizontal Kaplan Unloading, Re-assembly, Erection and Commissioning of Mechanical Equipment Completed
36 Chunchanakatte SHP (BFL Site) – ONGOING 2 × 2.5 MW Vertical Full Kaplan Erection & Commissioning of Electro-Mechanical Equipment Ongoing

India’s Hydropower Sector: Current Landscape and Opportunities

  • Installed Capacity: As of June 2024, India’s hydropower sector has an installed capacity of 46,928 MW, accounting for 10.6% of the country’s total power generation capacity. It plays a vital role in ensuring reliable and flexible electricity supply.
  • Untapped Potential: Despite a total estimated hydropower potential of 145,320 MW, only around 32% has been harnessed, indicating substantial scope for future development.
  • Sluggish Growth: Capacity additions have slowed in recent years, with just 1,229 MW added over the past five years and only 78 MW commissioned during 2023–24.
  • Small Hydro Power (SHP): India’s SHP potential is 19,749 MW, but less than 20% has been utilized due to factors such as remote project locations and high transmission costs. As of June 2024, the installed SHP capacity stands at 5,005.25 MW.
  • SHP Generation Trends: SHP generation declined by 15% in 2023–24, totaling 9,485.04 MUs. However, there was a modest recovery in 2024–25 (up to June), with generation increasing by 2.68% to 2,104 MUs, compared to the same period last year.
  • Hydropower Generation Update: In 2024–25 (up to June), total hydropower generation rose marginally by 1.03% to 34,878 MUs. However, decreasing reservoir levels are raising concerns about reduced output during the summer months, increasing dependence on coal and other non-renewable sources. This emphasizes the importance of effective water resource management and a diversified energy mix.
  • Pumped Storage Projects (PSPs): PSPs are becoming critical for integrating renewable energy sources into the grid. They offer essential energy storage and grid balancing services to ensure stability in the supply of clean energy.
  • Operational PSP Capacity: India currently has 4,745.6 MW of pumped storage capacity in operation, distributed across key states:
    • Telangana – Nagarjuna Sagar PSP, Srisailam LBPH PSP
    • Maharashtra – Bhira PSP, Ghatgar PSP
    • Tamil Nadu – Kadamparai PSP
    • West Bengal – Purulia PSP
    • Gujarat – Kadana PSP, Sardar Sarovar PSP
  • Future Developments: An additional 61,060 MW of PSP capacity is under various stages of planning, investigation, and construction, pointing to a promising future for energy storage infrastructure in India.

 

Metric

Value

Total Installed Power Capacity

441.97 GW

Hydropower Installed Capacity

~44.4 GW (10.04%)

Hydropower Generation (2023–24)

146 BU

Hydropower Share in Generation

8.3%

Economically Exploitable Potential

148,701 MW

Small Hydro Potential

6,780 MW

Pumped Storage Potential

94,000 MW